New pool in Ayrshire

New build pool to existing property

Client brief to us.

Match existing building. Must be child friendly easy to look after and cost effective to run. Utilise two existing rooms plus can we use existing boiler room for plant equipment

What we did
  • Design, Planning, Building warrant and build package
  • 3 D concept of proposed finished pool and facilities
  • Steel frame building to match existing building, pool room and plant room integrated with 2 existing rooms to form a changing room and games room
  • 13 x 5 x 1.4 metre deep fully insulated deck level lined pool
  • Complete plant room with all systems, filtration, sanitisation, heating etc
  • Fully automated safety cover
  • Complete dehumidification and heat recovery package
  • Virtual chlorine free with UV. (Tap water levels of chlorine only)
  • Automated system with PC, smart phone and tablet monitoring. PH, Redox, Temperature pool and pool hall, pump etc
  • Alarm feedback to Kinniburgh Pools
  • Swim pump
  • Automated lit water feature
  • Sound system
  • Automated lighting
  • Granular rubber pool hall flooring with stone sitting area
  • Data, TV and phone system
  • Villeroy & Boch outside Spa
  • Full service package
Timescales

Total build time from planning being granted to client using pool, 22 weeks.

Contact us