Refurbishment project

Build new building over existing pool, fully re furbish pool and join to existing property

Client brief to us

Can you work with our existing Architect and main contractor? Low running costs would be good. Keep existing pool shell. Needs completely re plumbed and all new equipment and filtration. Child safety cover very important!

What we did
  • Worked with clients own Architect and Main Contractor
  • Pool building with Gym, changing rooms, shower, new living space and plant room
  • 8 x 4 x 1.4 metre deep fully insulated skimmer style tiled pool with built in steps
  • Complete plant room with all systems, filtration, sanitisation, heating, ventilation etc
  • Under floor heating
  • Fully automated safety cover built into end of pool
  • Complete dehumidification and heat recovery package
  • Virtual chlorine free with UV. (Tap water levels of chlorine only). Solar panel integration with oil boiler
  • Swim pump
  • Automated pool lighting
  • Sound system
  • Data, TV, and phone system
  • Granular rubber pool hall flooring with raised wooden Gym area
  • Outside Spa
  • Full landscaping
Timescales

Total build time from planning being granted to client using pool 22 weeks.

Contact us